Note: During the transit leg north we ran through a front (03 April ~0300-0400 GMT) and were heading directly into the wind/waves. Due to pitching, the SCS flow-through system pull in air and the pump lost its prime. This wasnt restored until later on 03 April, so the SCS flow-through data from much of the transit leg north is not good. I think water remained in the CTD can in the wet lab, so it might not be obvious from the CT records when it stopped flowing. Jim Nelson